AQ45IP cascades in schools across England

AQ45IP Cascades in Schools | England
1 November 2026 by
AQ45IP cascades in schools across England
Thermal Earth, Nick Salini

At a glance

  • Buildings: New-build and refurbished schools
  • Location: Northumberland to London
  • Heat source: Ground source, near-100% designs
  • System: Cascades of two to nine 45 kW heat pumps, natural refrigerant R290 (MasterTherm AQ45IP)
  • Our part: MasterTherm heat pumps and technical support to the installer
  • Period: 2025–2026

Compact R290 ground source heat pumps, cascaded to suit schools from small primaries to large secondaries.

The brief

School ground source designs now aim to cover almost all of the heating demand from the ground, with resilience if a unit fails and passive cooling in summer.

What was done

Running several 45 kW units as one cascade lets the plant follow demand closely and keeps the school warm if a unit is out of service (N+1). Passive cooling through plate heat exchangers uses the boreholes to cool classrooms in summer.

The result

  • Northumberland: nine units, 269 kW design peak load, 21 boreholes
  • London: eight units, 249 kW design peak load, passive cooling
  • Secondary school: four units, 127.6 kW design peak load, 97% of annual heat from the ground

Planning a school, venue or commercial building?

See our commercial heat pump systems

Installer or contractor?

We design, supply and support projects like this with our trade partners.

Join the partner programme


Share this post