  • Building: Secondary school
  • Location: Rhondda Cynon Taf
  • Heat source: Air
  • System: Four air source heat pumps using natural refrigerant R290 (MasterTherm BoxAir BA90IP), with a 1,000-litre buffer
  • Controls: BMS integration and heat metering
  • Our part: System design, MasterTherm heat pumps and commissioning support
  • Completed: February 2026

At Ysgol Nantgwyn, the old heating plant was swapped for four air source heat pumps while lessons carried on.

The brief

Replace end-of-life heating plant with a low-carbon system, without closing the school.

What was done

The heat pumps sit in a new fenced compound outside, connected to the plant room by 110 metres of pre-insulated pipe. The old steel plant was stripped out and the new system was in and running in about a week. It feeds a 1,000-litre buffer, is controlled through the school's BMS, and is heat-metered so its performance can be tracked.

The result

  • Fossil-fuel plant replaced with R290 heat pumps
  • About a week from strip-out to running
  • No disruption to teaching

Planning a school, venue or commercial building?

See our commercial heat pump systems

Installer or contractor?

We design, supply and support projects like this with our trade partners.

Join the partner programme


Share this post