At a glance
- Building: New workshop and stores building at a working tin mine
- Location: Pool, Redruth, Cornwall
- Heat source: Mine water, through a plate heat exchanger
- System: Two 97 kW heat pumps for heating and one 52 kW heat pump for hot water (MasterTherm AQ100.2ZHX, AQ50ZHX)
- Capacity: 246 kW now; plant room ready for more than 600 kW
- Our part: System design, MasterTherm heat pumps and commissioning support
- Completed: September 2026
At South Crofty in Cornwall, water already pumped from the mine now heats its new workshop and stores building.
The brief
South Crofty has to pump water out of its workings around the clock. The new building needed heating and hot water, and the obvious low-carbon source was the warm water already leaving the mine.
What was done
Mine water is taken off the rising main into an external kiosk, filtered, and passed through a plate heat exchanger so it never enters the building's system. The recovered heat runs to the plant room through a buried pipe. Two 97 kW units heat the building and a 52 kW unit makes hot water. The BMS is interlocked with the mine's own pumps, and the plant room is already piped for four more heat pumps.
The result
- Heat recovered from water the mine was already pumping
- Heat meters on both sides, so performance is measured, not estimated
- Built to more than double in capacity without new pipework
Got waste heat, mine water or process heat on site?
Installer or contractor?
We design, supply and support projects like this with our trade partners.