Case Studies

Case Study - Airbus Beluga Line, Broughton

AIRBUS is increasing capacity across its transport network with six new loading hangars dedicated to the company’s five Beluga aircraft – which are the world’s largest cargo carriers, developed to carry complete aircraft sections from different production sites around Europe to the final assembly lines in Toulouse or Hamburg. With the Hamburg station opening in mid-2014, the new Beluga Line Station in Broughton followed suit soon after in June 2015. To meet green credentials and without opting to install an outdoor unit, a MasterTherm EasyMaster (Indoor) was identified as the best heat pump to install.

The MasterTherm EasyMaster Indoor Split range represents a brand new concept of heat pump for indoor installation. Both the evaporator and fan unit are mounted inside, with ducted vents to draw air through the unit. The evaporator can be mounted up to 15 metres from the main unit and the two parts can be installed in two separate premises. The EasyMaster Indoor Split is the ideal solution for those situations where outdoor mounted units are simply not possible.

Credit: Airbus S.A.S 2015

 

Airbus Airbus Airbus

VIEW MORE CASE STUDIES

LEARN MORE ABOUT HEAT PUMPS

VIEW MASTERTHERM BROCHURE

 

 Unique Concept of an Air Source Heat Pump Installed inside a Plant Room.. 


This site uses Cookies

We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners who may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services. You consent to our cookies if you continue to use our website.